The work has begun on the basement! Alan spent Saturday afternoon propping up the old joists so he could add support to the main beam.
Today he added a 2x8 to the main beam (he had cut away the ends of the joists yesterday) and then sistered 2x8s to each joist on the east side of this section of the basement.
The original joists were only 3x4s and there was considerable sag in the floors. We had added extra support when we first moved in and Alan had taken most of the sag out so the support added to the main beam required no shimming. The floor in our bedroom feels different already. Next up, the other side. That will be a little more difficult since all the plumbing for the bathroom is there.
No comments:
Post a Comment