The contractor came today and set up to pour the basement floor today. They framed out the area for the stone section for the root cellar and leveled off the dirt floor, then installed plastic. Tomorrow they are back to pour the concrete. It's been a long time coming and we will be very happy to say good-bye to the old dirt floor in that section of the basement.
The cats aren't too happy about the work going on in the basement. They get fed in the basement and their litter boxes are down there. Their little kitty door is blocked off and their bowls and one litter box is upstairs. They caught on to using the litter box but were more upset about getting fed upstairs. Well kitties, only one more day.

Sunday, January 15, 2017

Basement Joist Work

The work has begun on the basement! Alan spent Saturday afternoon propping up the old joists so he could add support to the main beam.
Today he added a 2x8 to the main beam (he had cut away the ends of the joists yesterday) and then sistered 2x8s to each joist on the east side of this section of the basement.
The original joists were only 3x4s and there was considerable sag in the floors. We had added extra support when we first moved in and Alan had taken most of the sag out so the support added to the main beam required no shimming. The floor in our bedroom feels different already. Next up, the other side. That will be a little more difficult since all the plumbing for the bathroom is there.