Friday, October 30, 2015

Garage Update

Work on the garage is continuing, both inside and out. The gable end is nearly finished getting it's siding and the doors have been made for the attic storage area.

We got some nice strap hinges from Van Dyke's.
The inside of the garage/shop area is coming together too.

All the insulating, drywalling, spackling, and painting is done. Alan picked up a great stainless steel slop sink. He is finishing up the surface conduit/wiring then it is time to move in. Most of his shop has been stored in a friend's barn. It will be nice to have everything he needs to work on the rest of the house here in the shop instead of 15 minutes away.

No comments:

Post a Comment