On Day 1 (Wednesday) the young guy with the excavator dug the trench up to the barn:
and dug out most of the soil around the end bay of the garage.
Alan then laid the water pipe in the trench since the weather forecast was calling for heavy rain in the next 24 hours and we were afraid too much soil would get washed into the trench.
Next up for the trench is some backfill then laying the conduit for the electrical line, more backfilling then seeding. Alan will be doing all that work himself.
On Day 2 I went to work in the dark and came home in the dark. This morning I awoke to this:
It looks like a tornado came through here.
Can't wait to see what next week brings!